Managed Pressure Drilling System

EKM® MPD History

GRANDOIL started reaserching, developping and manufacturing the first generation of EKM® MPD drilling system in 2013, and successfully applied MPD drilling operations on wells in Tarim Base for CNPC in April 2014. Over years, we have been working hard to improve the control system and upgrade the equipment from G1 to G7, and provided MPD drilling operation services on rigsites from onshore to offshore for CNPC, Sinopec and CNOOC in China.

SZS.jpg

MPD operation onshore since 2013

MPD operation offshore for

 Jackup rig since 2019

MPD operation offshore for 

deepwater rig since 2022

GRANDOIL has owned 22 full packages of EKM® MPD drilling euipment and another 4 packages on building process, has provided MPD drilling services for more than 400 wells onshore & offshore sucessfully since 2014 with experienced MPD drilling teams.

GRANDOIL has also built a completed EKM® MPD drilling operation procedures for engineering.

1.  All EKM® MPD Drilling Crew Requirements  

 First Aid 
 
IWCF or IADC 

 EKM® MPD drilling experience

 H2
 Scott Air Pack 

2. Contingency Plans

 Plugged EKM® MPD drilling chokes 
 Serious RCD failure
 Drill string failure (Washout/Twist off)
 None return valve failure
 PWD tool failure
 Well control matrix

 EKM® MPD drilling chokes washed out
 Plugged drill string
 Rig mechanical or power failure
 Dog house contingency plan
 Plugged coriolis flow meter

3. EKM® MPD Drilling Operation Procedures

 Load/Unload Equipment Procedures
 Pressure Test EKM® MPD Equipment Procedure
 Tripping Procedure
 EKM® MPD drilling equipment flushing procedure

 Rig up/down EKM® MPD Equipment Procedures
 Connection Procedure
 RCD Bearing Assembly Change Out Procedure

4. Onsite EKM® MPD Drilling Orientation 

For the rig crew and thirty parties related on location, includes:

 EKM® MPD drilling operation procedures and contingency plans
 Hazardous areas and evacuation routes

 Radio protocol
 Practical drills

EKM® MPD drilling operations would not start until all crews are confident in the procedures

5. Potential hazards during EKM® MPD drilling

 Poor communication
 Not good training or learning
 Underbalanced BHP to cause kick
 Not following procedures

 Gas & hot mud release
 Overpressure to fracture formation to losses
 Trapped pressure in lines and rams

 Rig crews operating on mud tanks, valves on rig choke, standpipe and BOP without communicating their actions to the EKM® MPD crew. 