GRANDOIL started reaserching, developping and manufacturing the first generation of EKM® MPD drilling system in 2013, and successfully applied MPD drilling operations on wells in Tarim Base for CNPC in April 2014. Over years, we have been working hard to improve the control system and upgrade the equipment from G1 to G7, and provided MPD drilling operation services on rigsites from onshore to offshore for CNPC, Sinopec and CNOOC in China.
MPD operation onshore since 2013 | MPD operation offshore for Jackup rig since 2019 | MPD operation offshore for deepwater rig since 2022 |
GRANDOIL has owned 22 full packages of EKM® MPD drilling euipment and another 4 packages on building process, has provided MPD drilling services for more than 400 wells onshore & offshore sucessfully since 2014 with experienced MPD drilling teams.
GRANDOIL has also built a completed EKM® MPD drilling operation procedures for engineering.
1. All EKM® MPD Drilling Crew Requirements
▲ First Aid
▲ IWCF or IADC
▲ EKM® MPD drilling experience
▲ H2S
▲ Scott Air Pack
2. Contingency Plans
▲ Plugged EKM® MPD drilling chokes | ▲ EKM® MPD drilling chokes washed out |
3. EKM® MPD Drilling Operation Procedures
▲ Load/Unload Equipment Procedures | ▲ Rig up/down EKM® MPD Equipment Procedures |
4. Onsite EKM® MPD Drilling Orientation
For the rig crew and thirty parties related on location, includes:
▲ EKM® MPD drilling operation procedures and contingency plans | ▲ Radio protocol |
EKM® MPD drilling operations would not start until all crews are confident in the procedures
5. Potential hazards during EKM® MPD drilling
▲ Poor communication | ▲ Gas & hot mud release |
▲ Rig crews operating on mud tanks, valves on rig choke, standpipe and BOP without communicating their actions to the EKM® MPD crew. |